top of page

ZIGGURAT HOUSE
​
​
Project Status​
​
Location
​
Project Value
​
Service Provided
​
​
Planning stage​
​
Hertfordshire, U.K.
​
£ Undisclosed ​
​
Fire & Smoke control analysis of the residential stairwell
ZIGGURAT HOUSE
FIRE & SMOKE ANALYSIS
With a long, extended corridor a sensitivity analysis was required to determine the best location and size of the smoke ventilation system to provide a system to return the corridor to tenable criteria. Through a iterative process following a calculated route through the system could be designed to provide the best possible outcome.
RESIDENTIAL
bottom of page